Permitting Checklists

What to Bring When Filing for Your Permit
Building Permit
  • Building Permit Application (PDF), completed
  • Appropriate fees
    • If solar is part of new house construction, the fee is $15/$1000 installed cost plus a $50 filing fee
    • If solar array is to be installed on an existing structure, then the fee is $15/$1000
  • Drawings for the array with an engineer's stamp
  • Licenses for installer(s) and electrician(s)
  • Insurance certificates - Workers comp insurance
  • After install, an affidavit attesting that the array has been installed properly
Electrical Permit